Hoarding and gate boards
A large code at the pedestrian entrance aimed at induction.
It is the last point before someone is inside the working area.
Method statements get revised, the induction changes when the phase changes, and the board at the gate was installed in week one. A code keeps the gate current.
For sites where documentation is revised more often than signage is replaced.
This preview is a static QR code - the address is baked into the image. Change the destination later and this one stops working.
Free to create. No card required to print your first code.
Site documentation is versioned and signage is not. Induction packs get revised as the works move from groundworks to frame to fit-out, risk assessments are reissued after every incident, and subcontractors arrive on a Monday having read whatever was current when they tendered. The board bolted to the hoarding in week one cannot reflect any of that, so the gap is filled by a supervisor repeating information verbally and hoping it was heard correctly.
Signage installed at mobilisation stays put while documents are revised every phase.
Operatives work to a version that was superseded weeks ago.
The gate code always opens the current revision.
Someone stops work to walk them through it on the spot.
A code at the gate delivers induction before they reach the works.
Compliance depends on a signature sheet in a site cabin.
Scans are timestamped, giving a record independent of paper.
A large code at the pedestrian entrance aimed at induction.
It is the last point before someone is inside the working area.
A code on each item opening its inspection and operator record.
Pre-use checks are where paper records fail most often.
A code aimed at current notices, permits and phase updates.
The cabin is the only place everyone on site visits daily.
It can deliver the content, but whether it satisfies your legal duties depends on the regime you work under and your own competence assessment. Treat it as a way to guarantee everyone reads the current version, not as a substitute for the sign-off your safety adviser requires.
Check coverage at the actual entrance before relying on it, because hoardings and steel frames create dead spots that did not exist during the site survey. Where signal fails, teams usually place the induction code in the welfare cabin where wifi exists.
Specify exterior-grade laminated or engraved panels, keep the symbol above splash height, and avoid positions where site dust settles. A code on ordinary printed paper behind a plastic sleeve lasts roughly one winter and fails gradually rather than obviously.
Build your site safety and induction code now, download the QR code for your needs, and keep the destination editable for as long as the print is in the field.
Free to create. No card required to print your first code.